2002 Boxster S – 25,000 miles. Recent LN Engineering IMS Bearing Retrofit installation. Even though the original bearing itself was still ok, the oil seals were breached and dirty motor oil had already worked its way past the bearing and into the hollow IMS tube. Premature bearing wear – just a matter of when, not if…
Related Posts
2003 996 C4S Engine rebuild 3.6L to 3.8L upgrade
This past winter we were able to complete 2 996 engine rebuilds with displacement increase from 3.6L to…
November 24, 2014
The Panzerwagen hits the streets
The long term track car build up of “The Panzerwagen” is coming together. Full Elephant Racing Coil Over…
January 30, 2012
After having my Ims bearing replaced by Jeff, I can say that the work was perfection in every manner. True craftsmanship is alive and well at Kraftwerks!!! The website is an indication of attention to detail.